Requirements in Section 9.9 Hotels with Compliance Date of January 1, 2012
(refer to Article 9.1.3.1.)

Code Reference

What is Required

Compliance Date

Hotels constructed prior to Sept.1, 1971 Hotels constructed after Aug. 31, 1971

CONTAINMENT (REQUIRED TO CONTROL FIRE SPREAD)

9.9.2.1.

(6) floor assemblies constructed as fire separations Jan. 1, 2012 required now

9.9.2.2.

  fire-rating of buildings up to 3 storeys Jan. 1, 2012 required now

9.9.2.3.

  fire-rating of buildings up to 4 storeys Jan. 1, 2012 required now

9.9.2.4.

  fire-rating of buildings greater than 4 storeys and up to 6 storeys Jan. 1, 2012 required now

9.9.2.5.

  fire-rating of buildings greater than 6 storeys Jan. 1, 2012 required now

9.9.2.7.

  criteria for interconnected floor spaces Jan. 1, 2012 required now

9.9.2.9.

  fire separation between major occupancies Jan. 1, 2012 Jan. 1, 2012

9.9.2.10.

(7),(8) fire dampers in ducts at fire separations Jan. 1, 2012 Jan. 1, 2012

9.9.2.13.

  fire separation of vertical service spaces Jan. 1, 2012 Jan. 1, 2012

9.9.2.15.

(3) protection of guest suite floors against smoke movement from other guest suite floors Jan. 1, 2012 Jan. 1, 2012

MEANS OF EGRESS

9.9.3.2.

(2) dead end corridor limitations Jan. 1, 2012 required now
  (3) areas served by a dead end corridor Jan. 1, 2012 Jan. 1, 2012

FIRE ALARM AND DETECTION

9.9.4.14.

  voice communication systems in high buildings Jan. 1, 2012 Jan. 1, 2012

FIRE SUPPRESSION

9.9.5.1.

  fire fighting access routes Jan. 1, 2012 Jan. 1, 2012

9.9.5.2.

  standpipe and hose systems Jan. 1, 2012 required now

9.9.5.3.

  firefighters' elevators in high buildings Jan. 1, 2012 Jan. 1, 2012

9.9.5.5.

  emergency power for fire alarms, firefighters' elevators and emergency lighting Jan. 1, 2012 Jan. 1, 2012